East Stroudsburg Sr. High School SouthEast Stroudsburg, Pennsylvania

East Stroudsburg High SchoolEast Stroudsburg High School

Project Disciplines

  • General Contracting

The 210,000 sq ft additions and 150,000 sq ft alterations to the East Stroudsburg High School South consisted of a multi-phased renovation and reconstruction project which was performed in and around a fully operational High School with 1,500 students in Northeast Pennsylvania.  It required 25 site and building construction phases over a three year period, which required exceptionally difficult structural renovations, requiring work activities to be performed during multiple shifts to accomodate and protect the students learning environment.  This project included a state-of-the-art professional grade auditorium, gymnasium and athletic center, library, media center, computer technology and science laboratories, as well as computer aided audio and video equipped classrooms with smart board technology.  This highly technical renovation as well as new construction under considerably difficult working conditions with the ability to coordinate that effort with the High School administation and faculty in order to maintain their high standards of education and do so in a safe environment for students, teachers, and our work force.

Project Details

OWNER:
East Stroudsburg Area School District
REPRESENTATIVE:
James Shearouse
ADDRESS:
321 N. Courtland Street, East Stroudsburg PA 18301
TELEPHONE:
570-420-8500
FACSIMILE:
570-420-8384
ARCHITECT:
The Architectural Studio
ADDRESS:
50 Vine Street, Allentown PA 18102
TELEPHONE:
610-437-1737
FACSIMILE:
610-437-4547
WEBSITE:
n/a
CONTRACT PRICE:
$50,365,054.00
COMPLETION DATE:
September 2009