EDC Bldg 2001 Roof & Mechanical ReplacementDefense Distribution Center, Susquehanna PA

Project Disciplines

  • General Contracting
  • Electrical
  • Mechanical
  • Plumbing
  • Fire Protection

The work includes total tear-off of the existing EPDM and rigid insulation from existing roof; replace with adhered EPDM membrane utilizing a recovery board over new rigid insulation.  Replace existing skylights/smoke vents.  Existing roof drainage and overflow shall be brought up to code compliance.  Portions of the roof deck shall be replaced.  Inspection from underside of roof deck during construction by contractor to determine replacement of damaged roof deck.  Upgrade or replacement of HVAC systems, including chilled water system, air handling units, water treatment systems, HVAC control system, piping systems, domestic hot water systems, and other HVAC systems indicated.  Repair of the lightning protection system and electrical support for mechanical systems.

Project Details

OWNER:
Dept. of the Army - US Army Corps of Engneers
REPRESENTATIVE:
Michael Notto
ADDRESS:
Eastern Distribution Center, Susquehanna, Pennsylvania
TELEPHONE:
717-770-7312
FACSIMILE:
ARCHITECT:
Army Corps of Engineers
ADDRESS:
TELEPHONE:
unknown
FACSIMILE:
unknown
WEBSITE:
n/a
CONTRACT PRICE:
$52,571,863/Single Overall Prime
COMPLETION DATE:
2014